Real-time Project
Controls Dashboard
Every KPI. One screen. Live.
Connect directly to your Primavera P6 Professional database and see SPI, CPI, S-Curve, critical activities, and AI-generated insights update in real time — no manual exports, no stale data, no Excel.
Schedule
0.88
SPI
Cost
0.94
CPI
Complete
42%
Progress
Activities
12
Critical
Progress S-Curve
Critical Activities
AI Insight
SPI 0.88 indicates schedule slippage. 12 critical activities require attention. Forecast completion 18 days late. Recommend recovery plan by data date.
Everything included
Direct P6 SQLite Connection
Connects directly to your Primavera P6 Professional SQLite database. No exports, no plugins, no manual steps. Your live data in seconds.
Real-time KPI Cards
SPI, CPI, Percent Complete, Critical Activity Count, Negative Float, EAC — all updating every 30 seconds via WebSocket.
S-Curve Chart
Planned vs Actual vs AI Forecast on one chart. Instantly see schedule slippage and where the project is heading.
Critical Activities Panel
Live list of all critical path activities with status, float, and finish dates. Red flag any activity with negative float.
AI Narrative Engine
Local Mistral 7B AI writes a plain-English project health summary automatically. Copy it straight into your management report.
Milestone Tracker
Track all key milestones with RAG status, days remaining, and completion percentage. Never miss a contractual deadline.
WebSocket Live Updates
Dashboard data refreshes every 30 seconds automatically. No manual refresh needed. Always showing current project status.
Multi-Project Selector
Switch between all your P6 projects from the top bar. Instant switching with no page reload.
Project Info Panel
Contract dates, data date, planned completion, actual start — all key project header information in one place.
Why teams choose this
- Eliminate the Friday afternoon XER export and manual Excel update — connect once and it stays live
- Spot schedule slippage the moment it happens — not at the end of the month reporting cycle
- Generate AI-written project narratives in seconds — reduce report writing from hours to minutes
- Give every team member the same real-time view — no more outdated printed schedules
- Track critical path changes as they happen — act before delays compound
- One screen replaces 5 separate P6 reports — dashboard, S-curve, critical path, milestones, and KPIs
Who uses this
Planning Manager
Opens the dashboard every morning to check overnight WebSocket updates. SPI dropped to 0.87 — raises it in the daily stand-up before it becomes a problem.
Project Director
Checks the dashboard on their phone before the client meeting. Gets the AI narrative, screenshots the S-curve, pastes into the PowerPoint in 3 minutes.
Project Controls Engineer
Monitors the critical activities panel after each P6 update. Uses negative float alerts to prioritise recovery planning and resource reallocation.
See your P6 data live in minutes
Connect P6 Intelligence to your Primavera P6 database and have your first live dashboard running in under 30 minutes.