All Solutions·Solutions
Built for Commercial Managers

Turn delay events into
defensible claims.

P6 Intelligence gives Commercial Managers the schedule evidence, EOT automation, and contractual audit trail needed to protect entitlement and resolve disputes faster.

The commercial risks hiding in your programme

Every day without real-time schedule intelligence is a day your commercial position is exposed.

EOT claims lack schedule evidence

Your claim narrative is strong but the schedule-based time impact analysis is weak, unconvincing, or arrives too late to be useful.

Compensation events slip through

NEC4 notification windows are tight. Without real-time schedule monitoring, CE opportunities are missed or notified late.

Variation valuation is slow

Quantifying the programme impact of a variation requires days of manual schedule analysis that the contract doesn't give you time for.

Dispute evidence is disorganised

When a dispute escalates, reconstructing the sequence of events from emails and static P6 snapshots is costly, slow, and incomplete.

The commercial impact

2 hrs
EOT pack preparation

Down from 2–3 days of manual schedule analysis and document assembly.

0
Missed NEC notification windows

Automated deadline tracking means compensation events are always notified on time.

60%
Faster claim agreement

Structured, evidenced claims presented through the portal resolve faster than adversarial exchanges.

100%
Audit-ready evidence

Every event, change, and submission is permanently recorded and instantly retrievable.

Everything a Commercial Manager needs

Automated EOT Pack Generation

The moment a delay event is logged, P6 Intelligence assembles a structured EOT pack — impacted activities, float erosion timeline, critical path shift, and time impact analysis — ready for submission.

NEC4 Compensation Event Tracker

Track every CE from early warning to acceptance. Automated deadline reminders ensure notification windows are never missed and the audit trail is always complete.

Delay Event Library

Log delay events against activities with cause codes, contractual classification, responsible party, and supporting documents. Build your claim as the project progresses, not in a panic at the end.

Programme Impact Quantification

Run time impact analyses directly against your live schedule to quantify the programme effect of variations, changes, and employer risk events in hours, not days.

Float Erosion Trending

Track how total float across critical and near-critical activities has changed week by week. Powerful evidence that concurrent delay arguments don't hold up.

Baseline Comparison Reports

Generate a full diff between any two baseline revisions — showing exactly what changed, when, and under whose authority — formatted for contractual submission.

Concurrent Delay Analysis

Identify periods where both employer and contractor risk events overlap on the critical path. Essential for fair concurrent delay assessments under NEC, FIDIC, and JCT.

Real-Time Cost-Programme Link

Overlay cost data against programme progress to identify divergence between spend and earned value — flagging commercial risk before it becomes a dispute.

Stakeholder Claim Portal

Share a structured, read-only view of your EOT evidence with the client's commercial team — reducing adversarial back-and-forth and accelerating agreement.

Immutable Audit Trail

Every schedule change, delay log, and claim submission is timestamped and cryptographically sealed. Your evidence chain is unimpeachable.

Contract Event Notifications

Configurable alerts tied to contractual deadlines — early warning notices, CE assessments, programme submission windows — so nothing falls through the gaps.

Dispute-Ready Export

Export any claim pack, delay analysis, or audit trail extract in PDF or structured data format, ready for adjudication, expert review, or mediation.

How commercial teams use it

From NEC4 compensation event management to FIDIC claims and adjudication support — P6 Intelligence is built for the commercial realities of complex construction contracts.

Book a personalised demo

Commercial Manager — Tier 1 Contractor, Rail Programme

Managing 14 active compensation events on a NEC4 ECC contract. P6 Intelligence tracks every CE deadline, auto-generates time impact analyses, and maintains the audit trail for each event. The PM's monthly CE assessment meetings now take 40 minutes instead of half a day.

Senior Quantity Surveyor — Infrastructure Developer

A major employer risk event delays the critical path by 11 weeks. The EOT pack — including float trend charts, baseline comparison, and impacted activity schedule — is assembled and submitted within 48 hours of the event occurring.

Commercial Director — Specialist Contractor

Facing a concurrent delay argument from the main contractor, the team uses P6 Intelligence's float erosion timeline to demonstrate that their activities only became critical after the employer risk event — undermining the concurrent delay position entirely.

Works across all major contract forms

NEC4 ECC
FIDIC Yellow Book
JCT D&B
NEC3
FIDIC Red Book
Bespoke PBA

Protect your commercial position from day one.

Commercial teams using P6 Intelligence go into every EOT negotiation with structured, timestamped, schedule-based evidence — and they win more of them.