All Solutions·Solutions
Built for Planning Managers

Your schedule deserves
real-time intelligence.

P6 Intelligence gives Planning Managers live critical path visibility, automated EOT evidence, and stakeholder-ready reporting — without touching a spreadsheet.

Sound familiar?

These are the planning challenges P6 Intelligence was built to eliminate.

Baseline drift goes unnoticed

Schedule slippage accumulates silently for weeks before anyone realises the critical path has moved.

Float erosion is invisible

You're working from a static P6 export that's already 3 days old. By the time it's distributed, it's fiction.

EOT evidence is fragmented

When a delay event hits, the supporting evidence is scattered across emails, spreadsheets, and PDF extracts.

Baseline versions are uncontrolled

Multiple revisions circulating simultaneously with no single source of truth creates contradictory narratives.

What changes when you use P6 Intelligence

Faster EOT pack preparation

What used to take a planning engineer two days now takes two hours.

80%
Reduction in schedule query time

Stakeholders self-serve from the portal instead of emailing you for updates.

100%
Baseline version control

One source of truth. No more conflicting revision spreadsheets.

Real-time
Critical path visibility

Know the moment the critical path shifts — not at the next weekly meeting.

Everything a Planning Manager needs

Live Schedule Synchronisation

P6 Intelligence connects directly to your Primavera P6 database. Every update is reflected in real time — no exports, no manual imports, no lag.

Critical Path Monitoring

Continuous automated analysis of your critical and near-critical paths. Any activity that threatens programme completion triggers an immediate alert.

Float Trend Analysis

Track total float and free float trends over time across every activity. Spot creeping erosion weeks before it becomes a programme threat.

Baseline Comparison Engine

Compare any revision against any previous baseline with a full diff view — activities added, removed, and duration-changed — in seconds.

Automated EOT Pack Generation

When a delay event occurs, the system automatically assembles the supporting schedule narrative, impacted activities, and time impact analysis into a structured pack.

Look-Ahead Scheduling

2-week, 4-week, and 6-week look-ahead views generated automatically from your live schedule, formatted for site team consumption.

Resource Loading Visibility

Overlay resource histograms on your schedule to identify over-allocation hotspots and level resources before they cause delay.

Progress S-Curve Generation

Planned vs actual S-curves generated live from your schedule data. Share with stakeholders in one click — no spreadsheet required.

Delay Event Logging

Log delay events directly against impacted activities with cause codes, responsible parties, and contractual classification — all timestamped and auditable.

Multi-Project Dashboard

Manage a portfolio of concurrent programmes from a single dashboard. Switch between projects or view aggregate health metrics across all live schedules.

Constraint & Logic Audit

Automated scan of your schedule for hard constraints, missing logic, and open ends — the common culprits behind misleading float values.

Narrative Report Builder

Generate a formatted monthly progress report narrative from your schedule data with a single click, ready for client submission.

How planning teams use it

From single-project planning engineers to heads of planning managing multi-programme portfolios — P6 Intelligence adapts to your scale.

Book a personalised demo

Senior Planning Manager — Tier 1 Contractor

Managing 4 concurrent NEC4 programmes across two regions. P6 Intelligence gives a single portfolio view with automated float alerts, so critical path threats are caught and escalated before they become delay events. EOT packs are generated in hours, not days.

Planning Engineer — Infrastructure Project

Responsible for weekly progress reporting on a £400m civils scheme. The automated look-ahead and S-curve tools cut weekly reporting time from half a day to 45 minutes, freeing up time for actual planning work.

Head of Planning — Developer

Overseeing a JV programme where both parties need schedule visibility without exposing commercial sensitivities. The stakeholder portal lets each party see their relevant view without any raw P6 access.

Works with your existing tools

Primavera P6
Microsoft Project
ASTA Powerproject
Excel
PDF Export
SharePoint

Ready to take control of your programme?

Join planning teams across Tier 1 contractors, infrastructure owners, and developers who've eliminated schedule blind spots with P6 Intelligence.