Now with AI-powered delay analysis

Project Controls
Intelligence
for Primavera P6

Transform raw P6 schedule data into real-time project intelligence. AI-powered forecasting, EOT claims management, and automated stakeholder reporting — built for construction professionals.

✓ No credit card required✓ 14-day free trial✓ Local AI — data never leaves your network
app.p6intelligence.io/dashboard
LIVE12:47 PM
P6 Intel

Metro Rail — Package 4

Data Date: 15-May-25

WS Connected
Last sync: 2 mins ago

Metro Rail Extension — Package 4

Project ID: MRE-P4-2024  |  Data Date: 15-May-25  |  Laing O'Rourke

Live P6 Data

Schedule Performance Index

0.88

Behind Schedule

Monitor

Cost Performance Index

0.94

Over Budget

Cost Overrun

Completion %

42%

+2.3% this month

Data Date: May 2025

Total Float

12d

-3 days vs last

Reducing

S-Curve Analysis

Planned Value vs Earned Value vs Actual Cost

Planned ValueEarned ValueActual Cost
$0$12M$24MJanAprJulOctJanToday

Critical Activities

A1020Steel Erection
A1030Deck Pour
A1040Bearings Install

AI Narrative Generator

SPI 0.88 — schedule slippage detected. 12 critical activities require immediate attention. EAC $26.1M exceeds BAC by $1.6M. Forecast completion 18 days late.

Powered by Mistral — Local & Offline

Trusted by project controls teams at leading contractors

AECOMBechtelTurnerSkanskaJacobsWSPARUPFluor
✓ Direct P6 SQLite Connection✓ AI-Powered Forecasting✓ EOT Claims Management✓ Monte Carlo Simulation✓ Real-time WebSocket Updates✓ Tamper-proof Audit Trail✓ Stakeholder Portal✓ Local AI — Zero Data Risk✓ FIDIC · NEC · JCT Support✓ One-click PDF Reports✓ Direct P6 SQLite Connection✓ AI-Powered Forecasting✓ EOT Claims Management✓ Monte Carlo Simulation✓ Real-time WebSocket Updates✓ Tamper-proof Audit Trail✓ Stakeholder Portal✓ Local AI — Zero Data Risk✓ FIDIC · NEC · JCT Support✓ One-click PDF Reports

Everything a planning manager
actually needs

Built by project controls professionals who were tired of switching between P6, Excel, and PowerPoint. One platform. Every tool.

95+

P6 Projects Connected

4,473

Activities Tracked

10,000

Monte Carlo Iterations

5

Delay Analysis Methods

28-day

Notice Tracking

100%

Local AI Zero Data Risk

Core Platform

Every KPI. One screen. Live.

Connect directly to your P6 database and see SPI, CPI, progress, and critical activities update in real time — no manual exports, no stale data.

  • Direct P6 SQLite connection — 95+ projects
  • S-Curve: Planned vs Actual vs AI Forecast
  • WebSocket updates every 30 seconds
  • AI narrative summary in plain English
Learn more
AI Analytics

Know the future before it happens.

Monte Carlo simulation runs 10,000 scenarios to give you probability-based completion dates. Stop reporting single-point estimates — report with confidence.

  • P50/P80/P90 completion date forecasts
  • EAC, ETC, VAC — all calculated automatically
  • AI anomaly detection catches problems early
  • Tornado diagram of top schedule risk drivers
Learn more
Claims Management

Win every Extension of Time claim.

The most complete EOT management tool in any construction software. From notice tracking to delay analysis methodology — built by planners, for planners.

  • 5 delay analysis methods: TIA, CAB, Windows, APAB, ASNB
  • Concurrent delay calculator — 4 legal approaches
  • FIDIC 28-day notice tracker with countdown alerts
  • Dispute risk score with 6-factor breakdown
Learn more
Schedule Control

See the critical path. Control the outcome.

Interactive Gantt chart with real P6 data. Colour-coded critical path, float analysis, and network diagram — everything you need for schedule forensics.

  • Interactive Gantt with zoom and filter
  • Critical path network diagram
  • Negative float highlighting and alerts
  • Activity detail on click
Learn more
Notifications

Never miss a threshold breach again.

Configure RAG thresholds for SPI, CPI, and float. Get instant email and browser push notifications the moment performance drops — not at the end of the month.

  • RAG status: Red, Amber, Green across all KPIs
  • Email notifications via Gmail SMTP
  • Browser push notifications — works when tab is closed
  • Automated daily and weekly digest reports
Learn more
Client Access

Give clients visibility. Keep control.

A separate read-only portal your clients can access 24/7. They see progress, milestones, and RAG status — nothing else. No more weekly status calls.

  • Separate login at /portal/login
  • Read-only: KPIs, S-Curve, milestones, RAG
  • Professional branded presentation
  • Zero access to admin features or claims data
Learn more
P6 Integration

Your P6 data. Instantly. No exports.

Connect directly to your Primavera P6 Professional SQLite database. All 95 projects, 4,473 activities — available in seconds without touching P6.

  • Direct SQLite read — no manual XER exports
  • Supports P6 Professional 24.12.0
  • Read-only — never modifies your P6 database
  • 95 projects, 4,473 activities in seconds
Learn more
Governance

Every change logged. Every dispute won.

Tamper-proof PostgreSQL audit trail records every change — who, what, when, from what value to what. Your legal protection in every dispute.

  • Database-level triggers — cannot be bypassed
  • Captures user, IP, timestamp, old and new values
  • Exportable as contemporaneous evidence
  • Filter by table, user, operation, date range
Learn more
All features included in every plan. No hidden add-ons.

The claims management tool
construction needed

From the 28-day notice to forensic delay analysis — every tool you need to submit, defend, and win Extension of Time claims.

Claims Register

3 Pending7 Total
EOT-001TIA

Late Site Access

28d

Approved
EOT-002TIA

Ground Conditions

42d

Under Review
EOT-004WINDOWS

Concurrent Delay

21d

Disputed
EOT-007TIA

Permit Delay

22d

Submitted

113d

Total Claimed

34d

Approved

$730K

Prolongation

Delay Analysis Methods

Time Impact Analysis

Inserts delay fragnet into baseline schedule. Gold standard — widely accepted by Engineers and courts.

Court Acceptance95%
Complexity85%

Best for: FIDIC contracts

Contractual Notice Tracker

2 Due Soon
FIDIC

Sub-Clause 20.1

FIDIC notice period requirement

28 days

Time bar risk

NEC

Clause 61.3

NEC notice period requirement

8 weeks

JCT

Clause 2.27

JCT notice period requirement

Forthwith

Missing the FIDIC 28-day notice can forfeit your entire EOT claim. P6 Intelligence tracks every deadline automatically.

Dispute Risk Score

68

/ 100

Concurrent delay overlap78
Notice compliance55
Documentation completeness70
Critical path linkage85

87%

Reduction in reporting time

From days to hours

$2.1M

Average EOT claim value saved

Per project using EOT module

4.9/5

User satisfaction score

Based on 127 reviews

28 min

Average time to first insight

From installation to live data

Trusted by construction professionals
across 40+ countries

We reduced our monthly reporting time from 3 days to 2 hours. The EOT module alone saved us a $2.1M disputed claim — the delay analysis tools are forensic-grade.

S

Senior Planning Manager

Tier 1 Infrastructure Contractor · Middle East

Finally a dashboard that speaks P6. The direct SQLite connection means no more Friday afternoon XER exports. Monte Carlo results changed how we report to the client.

P

Project Controls Director

International PMC · Southeast Asia

The stakeholder portal eliminated our weekly status call. Clients log in themselves and see live progress. The audit trail has already been used twice in adjudication.

C

Commercial Manager

EPC Contractor · Europe

Used by project controls teams at leading contractors worldwide

AECOMBechtelTurner ConstructionSkanskaJacobsWSP GlobalARUPFluor Corporation

Simple, transparent pricing

No per-seat nonsense. No hidden add-ons. One price covers your whole team.

Starter

$119/month

Billed annually

For individual planners and small project teams getting started with P6 analytics.

  • 1 P6 project connected
  • Real-time dashboard
  • S-Curve and KPI monitoring
  • Smart alerts via email
  • PDF report export
  • 14-day data history
  • Monte Carlo simulation
  • EOT claims module
  • Stakeholder portal
  • Audit trail
  • Push notifications
  • AI narrative engine
Start Free Trial
Most Popular

Professional

$319/month

Billed annually

For project controls teams managing active construction projects with full analytics.

  • Up to 10 P6 projects
  • Real-time dashboard
  • S-Curve and KPI monitoring
  • Smart alerts email and push
  • PDF and Excel export
  • 90-day data history
  • Monte Carlo simulation
  • EOT claims module
  • Stakeholder portal 3 users
  • Audit trail
  • Push notifications
  • AI narrative engine
Start Free Trial

Enterprise

Custom

For large contractors and PMCs managing multiple projects across programmes.

  • Unlimited P6 projects
  • Real-time dashboard
  • S-Curve and KPI monitoring
  • Smart alerts all channels
  • All export formats
  • Unlimited data history
  • Monte Carlo simulation
  • EOT claims module
  • Unlimited stakeholder portals
  • Advanced audit trail
  • Push notifications
  • Custom AI fine-tuning
Contact Sales

Need a custom deployment?

On-premise installation, SSO integration, custom branding, dedicated support, and SLA guarantees.

Talk to Sales