Project Controls
Intelligence
for Primavera P6
Transform raw P6 schedule data into real-time project intelligence. AI-powered forecasting, EOT claims management, and automated stakeholder reporting — built for construction professionals.
Metro Rail — Package 4
Data Date: 15-May-25
Metro Rail Extension — Package 4
Project ID: MRE-P4-2024 | Data Date: 15-May-25 | Laing O'Rourke
Schedule Performance Index
0.88
Behind Schedule
Monitor
Cost Performance Index
0.94
Over Budget
Cost Overrun
Completion %
42%
+2.3% this month
Data Date: May 2025
Total Float
12d
-3 days vs last
Reducing
S-Curve Analysis
Planned Value vs Earned Value vs Actual Cost
Critical Activities
AI Narrative Generator
SPI 0.88 — schedule slippage detected. 12 critical activities require immediate attention. EAC $26.1M exceeds BAC by $1.6M. Forecast completion 18 days late.
Powered by Mistral — Local & Offline
Trusted by project controls teams at leading contractors
Everything a planning manager
actually needs
Built by project controls professionals who were tired of switching between P6, Excel, and PowerPoint. One platform. Every tool.
95+
P6 Projects Connected
4,473
Activities Tracked
10,000
Monte Carlo Iterations
5
Delay Analysis Methods
28-day
Notice Tracking
100%
Local AI Zero Data Risk
Every KPI. One screen. Live.
Connect directly to your P6 database and see SPI, CPI, progress, and critical activities update in real time — no manual exports, no stale data.
- Direct P6 SQLite connection — 95+ projects
- S-Curve: Planned vs Actual vs AI Forecast
- WebSocket updates every 30 seconds
- AI narrative summary in plain English
Know the future before it happens.
Monte Carlo simulation runs 10,000 scenarios to give you probability-based completion dates. Stop reporting single-point estimates — report with confidence.
- P50/P80/P90 completion date forecasts
- EAC, ETC, VAC — all calculated automatically
- AI anomaly detection catches problems early
- Tornado diagram of top schedule risk drivers
Win every Extension of Time claim.
The most complete EOT management tool in any construction software. From notice tracking to delay analysis methodology — built by planners, for planners.
- 5 delay analysis methods: TIA, CAB, Windows, APAB, ASNB
- Concurrent delay calculator — 4 legal approaches
- FIDIC 28-day notice tracker with countdown alerts
- Dispute risk score with 6-factor breakdown
See the critical path. Control the outcome.
Interactive Gantt chart with real P6 data. Colour-coded critical path, float analysis, and network diagram — everything you need for schedule forensics.
- Interactive Gantt with zoom and filter
- Critical path network diagram
- Negative float highlighting and alerts
- Activity detail on click
Never miss a threshold breach again.
Configure RAG thresholds for SPI, CPI, and float. Get instant email and browser push notifications the moment performance drops — not at the end of the month.
- RAG status: Red, Amber, Green across all KPIs
- Email notifications via Gmail SMTP
- Browser push notifications — works when tab is closed
- Automated daily and weekly digest reports
Give clients visibility. Keep control.
A separate read-only portal your clients can access 24/7. They see progress, milestones, and RAG status — nothing else. No more weekly status calls.
- Separate login at /portal/login
- Read-only: KPIs, S-Curve, milestones, RAG
- Professional branded presentation
- Zero access to admin features or claims data
Your P6 data. Instantly. No exports.
Connect directly to your Primavera P6 Professional SQLite database. All 95 projects, 4,473 activities — available in seconds without touching P6.
- Direct SQLite read — no manual XER exports
- Supports P6 Professional 24.12.0
- Read-only — never modifies your P6 database
- 95 projects, 4,473 activities in seconds
Every change logged. Every dispute won.
Tamper-proof PostgreSQL audit trail records every change — who, what, when, from what value to what. Your legal protection in every dispute.
- Database-level triggers — cannot be bypassed
- Captures user, IP, timestamp, old and new values
- Exportable as contemporaneous evidence
- Filter by table, user, operation, date range
The claims management tool
construction needed
From the 28-day notice to forensic delay analysis — every tool you need to submit, defend, and win Extension of Time claims.
Claims Register
Late Site Access
28d
ApprovedGround Conditions
42d
Under ReviewConcurrent Delay
21d
DisputedPermit Delay
22d
Submitted113d
Total Claimed
34d
Approved
$730K
Prolongation
Delay Analysis Methods
Time Impact Analysis
Inserts delay fragnet into baseline schedule. Gold standard — widely accepted by Engineers and courts.
Best for: FIDIC contracts
Contractual Notice Tracker
2 Due SoonSub-Clause 20.1
FIDIC notice period requirement
28 days
Time bar risk
Clause 61.3
NEC notice period requirement
8 weeks
Clause 2.27
JCT notice period requirement
Forthwith
Missing the FIDIC 28-day notice can forfeit your entire EOT claim. P6 Intelligence tracks every deadline automatically.
Dispute Risk Score
68
/ 100
87%
Reduction in reporting time
From days to hours
$2.1M
Average EOT claim value saved
Per project using EOT module
4.9/5
User satisfaction score
Based on 127 reviews
28 min
Average time to first insight
From installation to live data
Trusted by construction professionals
across 40+ countries
We reduced our monthly reporting time from 3 days to 2 hours. The EOT module alone saved us a $2.1M disputed claim — the delay analysis tools are forensic-grade.
Senior Planning Manager
Tier 1 Infrastructure Contractor · Middle East
Finally a dashboard that speaks P6. The direct SQLite connection means no more Friday afternoon XER exports. Monte Carlo results changed how we report to the client.
Project Controls Director
International PMC · Southeast Asia
The stakeholder portal eliminated our weekly status call. Clients log in themselves and see live progress. The audit trail has already been used twice in adjudication.
Commercial Manager
EPC Contractor · Europe
Used by project controls teams at leading contractors worldwide
Simple, transparent pricing
No per-seat nonsense. No hidden add-ons. One price covers your whole team.
Starter
Billed annually
For individual planners and small project teams getting started with P6 analytics.
- 1 P6 project connected
- Real-time dashboard
- S-Curve and KPI monitoring
- Smart alerts via email
- PDF report export
- 14-day data history
- Monte Carlo simulation
- EOT claims module
- Stakeholder portal
- Audit trail
- Push notifications
- AI narrative engine
Professional
Billed annually
For project controls teams managing active construction projects with full analytics.
- Up to 10 P6 projects
- Real-time dashboard
- S-Curve and KPI monitoring
- Smart alerts email and push
- PDF and Excel export
- 90-day data history
- Monte Carlo simulation
- EOT claims module
- Stakeholder portal 3 users
- Audit trail
- Push notifications
- AI narrative engine
Enterprise
For large contractors and PMCs managing multiple projects across programmes.
- Unlimited P6 projects
- Real-time dashboard
- S-Curve and KPI monitoring
- Smart alerts all channels
- All export formats
- Unlimited data history
- Monte Carlo simulation
- EOT claims module
- Unlimited stakeholder portals
- Advanced audit trail
- Push notifications
- Custom AI fine-tuning
Need a custom deployment?
On-premise installation, SSO integration, custom branding, dedicated support, and SLA guarantees.