All Features·P6 Integration

P6 Live
Connection

Your P6 data. Instantly. No exports.

Connect directly to your Primavera P6 Professional SQLite database. Live portfolio sync, real-time activity data, and zero export risk — all without modifying the source database.

Connection Status

Primavera P6 Professional — SQLite

Connected

Database file

C:/P6/Projects/p6-live.db

Projects loaded

95+

Activities synced

4,473

Refresh rate

30s

Everything included

Direct P6 SQLite Connection

Connect directly to Primavera P6 Professional data without exports or manual file transfers.

Live Project Sync

See every P6 update reflected instantly in dashboards, analytics, and alerts.

Read-only Data Access

Never modify the source P6 database. Your connection is safe, secure, and non-destructive.

95+ Project Support

Load full P6 portfolios with thousands of activities in seconds.

Automatic Field Mapping

P6 codes, calendars, resources, and baselines map automatically with no configuration required.

Fast Data Refresh

WebSocket updates and incremental polling keep your project view current without slowing your system.

Zero Export Risk

No XER export, no XML transformation, no manual data handoff.

Secure Local Deployment

Keep every file and connection inside your network for maximum confidentiality.

Why teams choose this

  • Stop wasting time on manual exports and import cycles.
  • Keep P6 as the single source of truth while unlocking an integrated modern UI.
  • Avoid stale reports with live updates every time the P6 database changes.
  • Support large portfolios and multi-project dashboards without extra work.
  • Reduce risk by keeping the connection read-only and isolated from production P6.

Who uses this

Planning Manager

Connects the live P6 database before every weekly update so the team can review current float and critical path in one place.

Commercial Manager

Uses the direct connection to avoid manual XER exports and share accurate cost and forecast data with the finance team.

Claims Consultant

Relies on the live connection for EOT and audit evidence so the delay register always matches the source schedule.

Connect your P6 database once

Keep your Primavera P6 schedule as the source of truth while your team works from a modern, integrated project controls dashboard.