Back to case studies
Infrastructure

High-Speed Rail Phase 1

Replacing manual spreadsheet-based reporting with real-time linear dashboards allowed the government authority to hold 12 primary joint-venture contractors accountable to a single source of truth.

Challenge

This case study shows how P6 Intelligence helped the client move from manual data reconciliation and fragmented reporting to a single live project source of truth. The focus was on eliminating export-based workflows, closing schedule risk visibility gaps, and producing actionable evidence for claims and governance.

Outcome

The client gained immediate visibility into critical path risk, reduced reporting time, and captured defendable delay evidence for claims. Their project team now uses P6 Intelligence dashboards and narrative reports as the standard operating rhythm.