RenewablesIllustrative scenario
400MW Solar Array
Integrating historical weather models with P6 schedules allowed this contractor to automatically generate force majeure notifications the moment critical path delays occurred.
Challenge
A utility-scale solar array project needed to substantiate an EOT claim tied to permitting delays outside the contractor's control, but the owner disputed the causal link between the permitting delay and the actual critical path impact shown in the schedule.
Outcome
The Monte Carlo/EAC analysis module modeled schedule outcomes with and without the permitting delay isolated, producing a probabilistic view of critical-path impact that made the causal link explicit and quantifiable — turning a contested narrative into a data-backed submission.