Windows Analysis

P6 Intelligence's delay-analysis engine isolates specific schedule "windows" (time periods between baseline revisions or status updates) and measures how float and critical path shifted within each window. This lets you attribute delay to a specific cause rather than looking at the schedule as one undifferentiated slip.

Predictive Analytics

Rather than only analyzing what already happened, this module forecasts float erosion and critical-path risk based on current progress trends, flagging problems before they become claimable delays.

Monte Carlo / EAC Simulation

For schedule risk quantification, P6 Intelligence runs probabilistic simulations across your schedule logic to model a range of likely completion dates and estimate-at-completion (EAC) outcomes, rather than a single deterministic forecast.

Workspaces and Multi-Tenancy

Each organization operates in an isolated workspace with role-scoped access, so planning teams, commercial teams, and leadership can all work from the same synced schedule data with appropriate permissions.

Sync Model

Your P6 data stays in your Primavera environment; the desktop agent reads and syncs it to your workspace on a schedule you control, rather than requiring a permanent live connection.